Friday, June 26, 2015

Cookin with Peanut Oil (We have a hole and a basement!) Also Mortgage rates are rising…FYI

6/26/2015
House Progress

-So unfortunately delay on updates, however thats because we became parents on fathers day to a beautiful baby girl!

      So over the last week, the hole got dug, the footers then got poured, and now walls for the basement are in. After speaking with the project manager today he said that the basement got waterproofed yesterday and backfilling has begun.  Pic at the end with some captions.

-One thing I had not thought of but did the other day while driving around Timber Ridge was to see about any over runs on the rock for the elevation of our home. I had read somewhere a guy who had brick put on his home got some leftovers so….. I asked and my PM said although the amount they buy is usually very close to exact if there are any overruns he will ask the guys who put the stone on. I figure why not, we are paying for the stone right? So we shall see, but either way I appreciate that we have such an understanding PM who is willing to ask things like this and is fairly attentive to all customers with multiple builds going on.

 First day/digging
 Good to see where the drains and water lines come in, can also see the different layers of earth in this pic the clay at the bottom then roots/soil, and top soil
 Footers poured with drainage around it, also I have to say the pumps were running with this all going on since the rain in Cleveland lately has been out of control!
 View from back, can see that since clay came up high here, they left it higher where garage will be poured.
 View from driveway with slip forms
 View from back right corner facing street, can see in this pic the blue rubber hose which they have been trying to drain….


NVR and Rising Mortgage Rates

So with the Spring buying season having kicked off and a generally improving economy unfortunately the initial 3.75 rate we were working with is now well over 4% for example today is 4.375% we plan to basically keep eyeing the market and hopefully buy the rate down below 4 if that ends up being possible.

It sounds strange however if Greece defaults on loans on the 30th of June the world economy will be less strong and the rates may see a little drop from what I've read. So word to the wise anyone currently shopping loans, I would say lock sooner than later because the projections are rates will rise sharply this fall (good for those of us now or the ones who bought in the spring)

-Big thing none tells you at NVR (or well any mortgage brokers) is that you can spend a little money (1000) and get percentage points to bring your rate down… so we will see what happens below are some links I've been reading that may remain helpful to most people on mortgage rates.




Tuesday, June 16, 2015

Update 6/14/15

June 14, 2015

So..... they were supposed to stake out the house on Thursday or Friday per the PM of Last week (June 11) however we called our PM and were unable to get a hold of him. Needless to say we were disappointed. Well I shot the Sales rep and the PM emails saying hey your phone number doesn't work, please give an updated one. We did receive a response that same day and the issue was a misprint on our PM's card. (My advice before you leave your Roadmap is to verify the number with the PM) The area code was incorrect on the card so that was an easy fix. However they did not stake or dig as of yet (6/16) and the plan per our PM is to stake tomorrow and dig Thursday. 

I guess we will see how that goes, and hopefully we will be seeing our daughter soon as well, since she's due today but hasn't shown up yet.

Take care, -Kyle

Sunday, June 7, 2015

Road map Meeting, a great Project Manager, and a very nice surprise!

June 7, 2015
  So this past Friday we met with our Sales Rep and Project Manager to knock out all the final details. We started with going over the outside of the home and basic overview of topography. We added an extra outlet in the garage for future use, otherwise there wasn't much in the regard to upgrades or changes.
  I had one personal thing to address, which is making sure there was some kind of backflow on our storm water sewer (there have been water problems in much of northeast Ohio over the past few years). With that being said the PM did a great job drawing out how the sump pump will work with a yard drain and he also drew a basic diagram explaining where the backflow valve is in the sump as well as a blow off if the water backs up. I was really impressed with the answer to say the least. The other question I asked was "what if the drywall guys showed up and there was insulation in some of the interior walls?" Now I expected them to say no sweat equity blah blah blah but if it happens it happens, however I got that and then I also got its strongly not suggested so not sure how to approach that at this point.

Continued with the Basement, placed the sump on the side of the property with the yard drain so that it goes directly to the storm sewer, we talked about plumbing rough ins, overall not much to talk about but our PM said he would be very cognizant of the fact that we plan to finish the basement some day in regards to where electrical, water, and the garage drain are run. (the garage drain goes to storm sewer was my understanding)

First Floor
  We discussed where the fireplace would be, he pointed out carpet and linoleum breaks and we discussed the extra outlet that was placed above the cabinets (for Christmas lights and such). Fan rough in was discussed in the morning room and the "safety gate" across the back door was explained to us. I will say I get the whole safety gate on the morning room door but I do wish they at least provided stringers.... I will be doing that myself once we move in.

Second Floor
 The floor plan we chose was 3 bedrooms with the loft, one thing that the PM addressed here as well was that we shouldn't be surprised when we come by to look at the house and the bath tubs or other things like it are dirty or scuffed. The PM gave us his card and said if there is anything at all that seems out of place to let him know ASAP, he also said he prefers phone calls during business hours for a few reasons, emails get lost as he gets many, he prefers to immediately address issues, and he generally doesn't answer his work phone when the day is done. Moving on we have Fan rough ins for all bedrooms, beyond that the only thing needing discussed was the shelving they provide. I requested that at least in the master bedroom that they don't put in the shelving. I plan to put the brackets with arms in that are directly secured to the studs (those angle arms they provide just aren't all that strong IMO)

-Note here I also found out that the tub/shower combos are not just one piece if anyone is curious. I was curious because I am thinking of tiling the baths in the future.

Last but not least we did a detailed look at our Topography map and he explained everything we will see on our property when finished.
-We will have a "swale" between our home and our neighbor where the yard drain is to promote drainage to the drain itself
-There will be a storm sewer cap in the front (I know I don't love it either)
-There will be a shared electrical box on the property line
-A water shut off in the front yard
-There will be a clean out for the yard drain sticking up (which I can cut down and recap later)
-A tree will be placed out front as with every house

(So what your saying is I have a shitload of stuff in the yard......)


The nice surprise we received was that all homes in this development will now be coming standard with a Lamp post for no charge. My wife has wanted one, but didn't want to speak up so it got left out on our selections, but luckily we ended up with one anyways.

Another great thing throughout the Roadmap was that our PM color coded everything with highlighters so it was much easier for everyone to understand on the blueprints.

Welp enough of my rambling,  hope ya got something out of all this, plan is to flag out the site next week, and start to dig the week of the 15th (we might not get to see it since our daughter is due the 16th of June but we will see) I'll try to post some pics of topo maps if I get time, until the next update, have fun building, reading, and researching!

Saturday, May 9, 2015

Making selections, Rite Rug, things learned, digging soon!

5/7/15

First off Rite Rug

First thing learned, try to pick out countertops and cabinets prior to carpet appt
Second thing i had been told and i tend to agree with is at minimum upgrade to the 8 lb pad so the carpet will last at least the minimum amount of time.

Tammy in Strongsville at Rite Rug was nice...not pushy but also not super helpful either I felt. We picked the level I laminate and carpet to keep costs down (we intend to replace in the cing years with wood/tile)

Also (and i will sound dumb here likely) i did not realize unless you have gobs of money you get the laminate  and carpet throughout the house the same, i thought that you may get some variations in ateas like the bathroom but you do not.
We did whole house pad upgrade to 8lb at a cost of 1000. Below are our selections (black cherry stain handrail, fairfield wheat cabinets, jamocha formica countertops) also a note on the cabinets unless you get the top tier, all the cabinets are veneered doors just fyi.







We have chosen to add a 2 inch pvc pipe from the basement to attic (capped and "fire stopped") for 250 extra, we may never use it but we didnt add coax to the 2nd and 3rd bedrooms so i think it will.

Exterior color selections

Just an fyi if you didnt realize (not an issue for us) you cannot have the same elevation as the house across from you, your stone/brick/siding colors cannot be the same as your neighbors.

So we got the stone as we were "given" an incentive of 2000 towards elevation and really like stone more than brick (1000 difference)

Now, trying to understand colors, how they look with stones, and stsying within given color pallettes terribly not easy.....

We are narrowed down to pebble clay siding however the shutter/door/stone choices are at 2 at this point, we are going to head out and try to see how stones look on other homes this coming week before finalizing.

Pebble clay siding, naval door, and navy shutters (with cut stone)

Pebble clay siding, roycroft green door, and spanism moss (with ledgestone)

Ill try to update this post a little better soon (this is from my phone)

Also looked into outlets in the garage 175 for gfi outlets, and kept one hose bib in the garage, put one on the back (morning room)


Tuesday, May 5, 2015

A tale of a Ryan SR and his Sales Manager… and Guardian Meeting!

SR, his Manager, and Figuring the lots out

So I am backing up a bit here because I feel there is some information I didn't share before in regards to our Ryan experience thus far.

Our sales rep is a really nice guy and in all honesty for the most part I think he is trying to sell homes but he also cares about his clients. Well that lucky duck in our first thirty days of asking question after question and holding out for a price point we were comfortable with, well he went on vacation.

While he was gone the Sales Manager for Northeast Ohio came in one day and we happened to come in that day also to discuss our issues with what was offered. We posed our price point we were comfortable with and she came back to us with the idea of buying down our rate to keep our payment the same, at no point did we say we were trying to make a monthly payment so that frustrated us both (used car sales tactics to me).

We were looking at an incentive lot too that the manager could not understand why we did not like. I tried time after time to to explain to her I literally could hop the depth of my backyard based on the silt fence they had put up to indicate a wetland area. (let me note I understand no lots in todays market are going to be huge unless you live out in the country) On to her redeeming qualities here, she went out with me, my wife, and the other two Ryan representatives that day to the lot to measure out where a home (The Florence would sit on the lot). It's extremely hard to imagine a home on these ungraded lots particularly harder on this street where there is a silt fence at the back of all the lots. After going out and measuring the lot and numbers generally not matching up all around, she apologized and said that she would meet with the Project Manager to further clear up where they grade to and knock out other details I asked, such as does Ryan nail or screw in subfloors (which they actually do both).


On to the SR, he was very apologetic that we had wasted some time with her, but he did thank us for pointing out to her how difficult it was to explain to people how those lots worked based on the silt fences. He went above and beyond in my opinion, he got the topography map with the proposed house on it and we went out and flagged where the home would fall so we could easily see it. He then found out from the Project Manager that the home would be graded 20 feet from all edges and after I requested he put it in writing so we would feel more comfortable. BTW if you want to see a particular model of a house and how it would fall on a lot they have transparencies they can lay right over the topography map (have them do this on all lots you like if there is more than one). Also walk the lots so you can see if there are drain covers, lights, electrical boxes, or fire hydrants especially if they are all the same price...

TIPS

Anyways I thought this should be shared as I found out things such as we would have a yard drain, they have to grade up to 20 ft around home, they have to grade to a point where the city/county will allow, there is a storm sewer that runs on the front of all these lots and although we will have a cap it will fall in our driveway (oh well we lose concrete..), it was very helpful to know about the topography maps that they can place transparencies on, and lastly always deals with the SR instead of their boss if you can. Also if you are police or fire let them know, we got a hometown heroes discount it wasn't huge but I appreciate Ryan homes doing that also again worth asking.


Guardian Meeting

We met with Guardian yesterday (5/4) at the model in Timber Ridge. Joe was the Sales rep, he was on time, very nice/personable and did not pressure us at all. First Joe informed us that they would do all low voltage wiring (not outlets I was confused) and then he told us what we got standard which of course is not much… 2 coax and one phone (CAT5) line. We placed the coax and phone outlets and he asked if there was anything else we were interested in. As i did not want to waste time I had researched, my wife and I had talked about what we wanted, which was simply an extra coax so we would have coax in our living room, bedroom, and loft. The extra Coax was $100 for anyone wondering, honestly I expect that in the next 5 years everything will go mostly wireless so I'm not too worried. Anyways Joe asked if we wanted any info on Security systems, home vacuum, surround sound, whole home audio, or intercom, we declined and he was apologetic that we had to come out for that simple of an appointment. In total the appointment lasted about 30 minutes, like I said my wife and I had already talked and we will focus most upgrades on Rite Rug such as the 8 lb pad (Tomorrow).


Anyways enough of my rambling, hope some of this helps others!

Saturday, May 2, 2015

Rite Rug, Guardian soon! Slow going.....

5/2/15

So last day for structural changes is today, not much to report there haven't changed our minds a whole lot on that end. I was told by our SR that Rite Rug would call us within a week to schedule a time to pick flooring well after waiting 2 WEEKS I decided to call them myself, so far not impressed with that end of Ryan homes (Their secondary suppliers). So this coming week we meet with both Guardian and Rite Rug at the model and in Strongsville Respectively.

We are trying to keep this home fiscally responsible (as its our first home and our daughter is coming) but I'm going to bet Rite Rug won't help me keep anymore of my hair that I already have.... hopefully Samantha doesn't go into labor hah. We have plans to upgrade the padding as I have had that recommendation from just about every blog and every Ryan home owner I have met. Outside of that I expect we will upgrade to Level B as we have a dog and child soon. Outside of that I can do hardwood and or tile at a later date.

-I think I may be checking out Lumber liquidators with the recent controversies of formaldehyde I imagine they have got to have some good sales. (and I imagine they have removed all possible controversial products)


Anyone out there have any suggestions on Rite Rug, whats worth going for/not worth spending your money on upgrading? I'll try to update our experiences as soon as possible with both vendors, I am at this point skeptical at best so we shall see. Still very exciting just so much to get done.

Tuesday, April 28, 2015

4/27/15 Our options, choice, and NVR…. (The Good the bad, and the paperwork?)



  So we didn't go crazy with options but we chose to add the morning room, garage floor drain, upgraded the front of the home to stone did rough ins for fans, a fireplace with the slate, and kept the floor plan with the 3 bedroom plus loft (Florence).

We went with elevation C (colors not chosen yet below is just example and due to our street its flipped).


We met with Jon at NVR, nice guy I will say and brought the majority of the papers requested by Ryan and NVR. We are looking to go the conventional route at this point but it seems you must keep everything on the table. After meeting with Jon heres what I'll say he has a job and I get it but holy crap boring, and generally feel like we suck at life choices…. So to put it simply since we are having a child in June and she wasn't planning to return to work until September we won't have 30 days of pay stubs and we are not going to have to wait on word of how we can work this out. We could still go fha loan wise however not really wanting to do that. Soooooo make sure you work at least a month ahead of your closing or at least plan that way (gosh that sounds odd).

TIP for NVR, if you have recently moved funds due to closing out bank accounts or what not, make sure you have a paper trail or work on it now to make the process overall easier for you. They want copies of all larger deposits (over 1000 I think) so they can verify your money? Thats just a way to make your life easier also bring your SS card too!